Completed projects

CONSTRUCTION OF INTEGRATED SYSTEMS TO SUPPORT AND OPTIMISE WORK AND SAFETY OF MV SWITCHGEAR

The project involves the research work aimed at preparing ready-to-use solutions to support the operation and maintenance of MV (Medium Voltage) switchgear in the areas of safety, prevention and efficiency. The designed tools, once they are put into production, will be offered to customers either on their own (complete switchgear) or as individual components compatible with existing switchgear on the market.

Thanks to their parameterised functionalities, they will ensure reliable and safe operation and, in the event of an emergency, eliminate life-threatening situations for operators. In addition to the above, the functionalities will allow full identification of events and processes occurring during switchgear operation and simplify the supervision, operation and maintenance of power distribution support equipment.

Moreover, solutions will be introduced to increase the current capacity of the switchgear.

The scope of work responds to market needs related to the current condition of the energy infrastructure in Poland and worldwide and the drive to increase power supply reliability, efficiency and equipment performance, as well as problems with experienced and qualified staff operating the switchgear and the network. The devices being launched will be fully capable of operating in SMART GRID networks.

The work carried out by the consortium (Elektrometal Energetyka, Instytut Elektrotechniki, PW SiMR) will result in patent applications, as well as obtaining an industrial design. The research areas identified in the project were developed on the basis of the previous experience of the members and the consortium leader, whose recent implemented research results have been awarded, among other things, the Gold Medal at ENERGETAB 2015 (e.g. the e²TANGO family of universal field controllers).

The work will result in an integrated control and distribution security system (IMS).

THE PROJECT IS CO-FINANCED BY THE EUROPEAN UNION FROM THE EUROPEAN REGIONAL DEVELOPMENT FUND under Priority Axis I “Utilisation of research and development activities in the economy” of the REGIONAL OPERATIONAL PROGRAMME OF THE MAZOWIECKIE VOIVODSHIP 2014-2020.

The project is being implemented as part of Action 1.2 “Research and development activities of enterprises”

Beneficiary: Elektrometal Energetyka SA, Institute of Electrical Engineering

Project period: July 2016 – November 2018

Total project value: 5 221 383,78 zł

Funding value: 3 283 562,51 zł

Level of project funding: 66,41%

The project coordinator on the side of the Institute of Electrical Engineering was dr inż. Tomasz Błażejczyk.